No grid expansion
Charge from onboard energy storage so the site does not wait on a new transformer.

Mobile Power & Off-Grid
Deploy high-power EV charging anywhere — fleets, dealerships, roadside rescue, and events.
Towable or vehicle-mounted DC fast charging with onboard storage. No trench, no transformer upgrade, no waiting for a utility interconnection.




Charge from onboard energy storage so the site does not wait on a new transformer.
Rescue, overflow events, and yards where a fixed pile cannot be permitted in time.
OCPP 1.6J for charge-point software used by European and North American operators.
Overnight or mid-shift top-up without rebuilding the switchgear.
Bring DC power to a stranded EV instead of a flatbed-only recovery.
| Display | 7-inch color LCD screen |
|---|---|
| Card reader | ISO/IEC 14443A, Mifare |
| Cable length | 5 m stand |
| Connectivity | 4G, Wi-Fi, Ethernet |
| Communication protocols | OCPP 1.6J |
| User authentication | APP, RFID card |
| Environment | Indoor / Outdoor |
| Operating temperature | −35°C ~ 55°C |
| Storage temperature | −40°C ~ +80°C |
| Operating relative humidity | ≤95%, no condensation |
| Atmospheric pressure | 79 kPa ~ 106 kPa |
| Altitude | <2000 m |
| Ingress protection | IP54 |
| Dimensions (H × W × D) | 1200 × 760 × 678 mm |
| Noise | <65 dB |
| Power supply system | TN-S or TN-C-S |
|---|---|
| Power supply form | 3P+N+PE |
| Supply voltage | 260 Vac–485 Vac |
| Input current | 0 A ~ 91 A |
| Full load power | 60/80 kW |
| Power factor | ≥0.99 |
| Efficiency | ≥95% (full load) |
| Frequency | 55±10 Hz |
| Harmonic distortion (THDi) | ≤5% |
| Charging mode | CCS2 (also CCS1 / GB/T combinations) |
|---|---|
| Output power | 60/80 kW |
| Output voltage range | 150 VDC–1000 VDC |
| 1 channel maximum output current | 200 A / 250 A |
| 2 channels maximum output current | 100 A |
| Number of outputs | 2 × CCS2, or 2 × CCS1, or 2 × GB/T, or 1 × CCS1 + 1 × CCS2, or 1 × CCS2 + 1 × GB/T |
| Current stabilizing precision | ≤ ±1% |
| Voltage stabilizing precision | ≤ ±0.5% |
| Protections | Input over/under-voltage, short circuit, over-current, over-temperature, leakage, lack of phase |
|---|
| Safety and compliance | CE |
|---|---|
| Testing according to | EN IEC 61851-21-2:2021; EN IEC 61851-1:2019; EN IEC 61851-23:2014; EN IEC 61851-24:2014 |
| Warranty | 24 months, warranty extension possible |
| Software update | OTA updates via web portal |
Ask sales for the latest certificate files for the destination market. CE alone is not enough for every region.
Lead time depends on battery capacity and gun type. Ask sales for the current production slot. This line is sold as B2B projects, not retail units.
No. Canadian buyers typically need a CSA / UL path (for example CSA C22.2 No.346 / UL 2202). Tell us the destination and we map the approval route.
EV Charging Infrastructure
Turnkey DC fast chargers for charge-point operators, dealers, and logistics hubs. Sized around the 80–180 kW commercial sweet spot, with 240 kW available.
Learn more →
Commercial & Industrial Storage
Industrial cabinet aimed at peak shaving and buffering EV DC chargers.
Learn more →